QUICK ACCESS: Use the drop-down menu below for quick access to projects.
Select a Project for Quick Access
1300 CB Moore Smart Classroom (2005 Housing R&R Fund Contingency Project)
1930 Harbourside Drive, Unit 156 M- 1, Fairway Bay Condominium, Longboat Key, Florida
2000 Concrete Repairs
3-Tesla & 1.5-Tesla Magnetic Resonance Imaging (MRI) Systems Temple University Hospital — 1st Floor Ancillary Building
3-Tesla & 1.5-Tesla Magnetic Resonance Imaging (MRI) Systems Temple University Hospital— 1st Floor Ancillary Building
4700 Wissahickon Avenue Lease Amendment
49-Passenger Bus for the Ambler-Main Campus shuttle service OFM PDF Project Plan 05-09
6th Floor Medical Research Building- Room 619
A mouse gene therapy model for CML
AB 3130 Genetic Analyzer
AC 103 & AC 104 Computer Classroom Technology Upgrades
Acquisition 1418 W. Tioga Street
Acquisition 1521-1539 Cecil B. Moore Avenue
Acquisition of 1418 W. Norris Street.
Acquisition of 1735-59 N. 10th Street / 920-28 W. Montgomery Avenue
Acquisition of grant-funded computers for SCAT
Acquisition of Hyperion Planning and Analyzer Software for Mission-Based Financial Reporting and Budgeting
Acquisition of Research Equipment for Kinesiology Department
Acquisition of Solid State Lasers for the research project entitled:”DNA Repair in Real Time: Ultrafast and Single Molecule Chemistry".
Acquisition of two lasers for chemical and biological agent detection.
Addition of video conferencing capability for two classrooms at Fort Washington.
Additional expenditures for Center for Social Policy at 1415 N. Broad Street.
Administrative Computing Conversion
Agreement of Lease-Hanger Prosthetics and Orthotics, Inc.
Air Conditioning Addition Johnson Hardwick Halls Project 07-1
AL-19 Computer Classroom Expansion and Technology Upgrades
AL-21 Computerized Classroom Upgrades [REVISED]
AL-22 Computer Classroom Expansion and Technology Upgrades
AL-22 Computerized Classroom Upgrades
Allocation of Computer & Technology Fund
Alternative Housing-Elmira Jeffries Building Furniture Purchase
Alternative Housing-Franklin House Furniture Purchase
Alternative Housing-Kardon Building Furniture Purchase
Ambler Athletic Fields — Land Development Plans/Permit Professional Services
Ambler Athletic Fields, 2003 Forecast #30
Ambler Barn - Roof placement OFM PDF Project Plan 06-60
Ambler Campus Plan
Ambler College Learning Center Landscape Design & Construction
AMBLER Dining Hall — Generator Replacement PDF Reserve 2006-07
Ambler Electrical Distribution — High Voltage Yard Enlargement OFM PDF Project Plan 06-58
Ambler Greenhouse Construction
Ambler Learning Center — Landscaping Upgrades and Parking Study DESIGN FEE ONLY OFM PDF Project Plan 06-59
Ambler Learning Center Design & Construction
AMBLER Library & Computing Center — Fire Alarm Replacement OFM PDF Project Plan 05-57
Ambler Library & Computing Center — HVAC Unit Replacement 2005 Forecast 05-58
Ambler Parking Lot Rehabilitation
Ambler Performance Space
AMBLER Widener Hall - Rooftop Chiller Replacement OFM PDF Project Plan 07-21
Analytical Equipment Upgrade for the Drug Research Unit.
Anderson Hall Roof Retrofit, 2003 Forecast #31
Anderson Lecture Hall 14
Anderson Main Lobby Renovations
Anderson Mezzanine Repairs
Annenberg Air Handlers
Annenberg Hall — School of Communications and Theater (SCAT) Renovations 2005 Forecast 05-88
Annenberg Hall — West Wing Renovation
Annenberg Hall Atrium and Building Entry - Phase 1
Annenberg Hall Atrium and Building Entry Phases I and 2
Annenberg Hall Chiller Replacement, 2003 Forecast #33
Annenberg Hall Public Area Improvements, Phase 1.
Apollo Entertainent Center and Parking Garage Design
Architecture — Upgrades to Student Labs
Asian Tobacco Education and Cancer Awareness Research
Atrium Window Replacement (Klein Hall) 2004 Forecast 04-28
Baptist Temple — Pre-Design 2005 Forecast 05-24
Baptist Temple Design & Pre-Construction
Baptist Temple Roof/Structural/Masonry Repair - Design and Construction
Baptist Temple Structural Roof Assessment
Barrack Hall Interior Design Services
Barton Hall - Design Phase OFM PDF Project Plan 06-20
Barton Hall — Pre-Design Study 2005 Forecast 05-28
Bell Bldg and Barrack Hall - CFC Chiller Conversion, 2003 Forecast #35
Bell Building General Use Computer Lab — Completion of Design Services
Bell Building General Use Computer Lab — Programming and Schematic Design Services
Bell Building Renovation - Computer Recycling Center
Best Western Lease Renewal
Beury Hall, Phase II (of V) - Renovation Construction 2005 Forecast 05-16
Beury Hall, Phase III of V — Renovation Construction OFM PDF Project Plan 06-17
Beury Hall, Phase IV of V - Renovation Construction OFM PDF Project Plan 07-17
Bio-Life Air Handler Replacement, 2003 Forecast #03 - 18
Bio-Life Breaker Refurbishment
Bio-Life Exhaust Replacement, 2003 Forecast #03 - 19
Biology & Life Sciences Building — Chiller Refrigerant Conversion 2005 Forecast 05-30
Biology & Life Sciences Building - Cooling Towers OFM PDF Project Plan 07-30
Biology & Life Sciences Building — Domestic Hot Water Heat Exchanger Replacement 2005 Forecast 05-33
Biology & Life Sciences Building - Motor Control Center Replacement - 2005 Fore 05-36
Biology & Life Sciences Building — Pneumatic Controls Replacement OFM PDF Project Plan 06-23
Biology & Life Sciences Building — Pneumatic Controls Replacement OFM PDF Project Plan 06-23
Biology & Life Sciences Building — Smart Classroom Conversion (Room 108) OFM PDF Project Plan 07-30
Biology & Life Sciences Building — Switchgear Replacement 2005 Forecast 05-37
Biology & Life Sciences Building — Switchgear Replacement 2005 Forecast 05-37
Biology & Life Sciences Building—Upgrades and renovations to the ceilings in common areas, 2 Floor Animal Rooms, and motor control center for building. 2005 Forecast 05-32, 05-34, and 05-36
Biomedical Research Infrastructure Enhancement — Purchase/Installation of Analytical Equipment for Biomedical Research — Sort enhanced high-speed Flow Cytometer
Blade Server Center
Blology & Life Sciences Building — HVAC Replacement 2nd Floor Animal Rooms 2005 Forecast 05-34
Brew Pub Lease
Bright Hall Roof Replacement
Broad Street & Diamond Street Garages -- Design Services
Broad Street Main Steam Distribution Line Replacement (Health Science Center)
Building Assessments (24), 2003 Forecast #55
C.E.A.. - Air Handling Unit Overhaul OFM PDF Project Plan 06-25
CAF Equipment Needs for the 9th Floor MRB
Campus Video Surveillance
Campus Wide Ground Level Camera System
Card Access Office required capital investment
Carnell & Wachman Halls, 9th & 10th Floor Renovations
Carnell Hall - Renovate Bursar’s Office OFM PDF Project Plan 06-50
Carnell Hall — Student Financial Service Center Renovations OFM PDF Project Plan 06-51
Carnell Hall, 11th & 12th Floor Restoration
Carpet replacement Ambler Campus
CCWP Bell Building
Cellular Responses to Inorganic Particles
Central Animal Facility (CAF) - National Institutes of Health (NIH) Renovation Project - Medical Research Building (MRB) - 9
Central Animal Facility (CAF) - Renovations and Equipment
Central Animal Facility (CAF) Renovation - 6 Pharmacy Building
Central Chiller Plant — Screen Repair of Older Cooling Towers OFM PDF Project Plan 07-76
Central Chiller Plant — Switchgear Cooling Improvements 2005 Forecast 05-3 8
Central Heating Plant — Fire Alarm Replacement 2005 Forecast 05-39
Central Heating Plant — Roof Replacement 2005 Forecast 05-40
Central Heating Plant - Sub-station Replacement OFM PDF Project Plan 05-41
Charge Capture Enhancements Initiative
Chemistry Department Renovation of New Faculty Lab
Chemistry NMR Facility
Chemistry Offices
Chemistry offices
Child & Adolescent Treatment Center, Weiss hall basement, B-18 & 819.
Classroom Renovation - Room 322 Faculty Student Union Building
Classroom Technology Upgrades in Eight CLA Classrooms
Classroom Technology Upgrades in Nine Classrooms - Summer 2004
Clinical Skill and Simulation Centers - Phase I Dental School I
Clinical Skills and Simulation Centers - Phase II
College of Education Phased Furniture Replacement
College of Education Smart Classroom Conversion
College of Engineer & Architecture (CEA) — Perimeter Heating System Upgrade OFM PDF Project Plan 07-47
College of Engineering — Redesign Lab Room 207
College of Engineering & Architecture — Pneumatic Controls Replacement OFM PDF Project Plan 0748
College of Engineering & Architecture (C.E.A.) - Restroom Conversions to ADA Standards OFM PDF Project Plan 06-26
College of Engineering & Architecture (CEA) — Computer room A/C Unit Replacement OFM PDF Project Plan 07-35
College of Engineering & Architecture (CEA) — Door and Frame Repairs OFM PDF Project Plan 07-38
College of Engineering & Architecture (CEA) — Electrical Panel Replacement OFM PDF Project Plan 07-40
College of Engineering & Architecture (CEA) — General Exhaust Fan Replacement OFM PDF Project Plan 07-49
College of Engineering & Architecture (CEA) — Reheat Coil Installation OFM PDF Project Plan 07-49
College of Engineering & Architecture Fan Coil Unit Replacement in Stairwells and Perimeter Corridors OFM PDF Project Plan 07-43
Colloid and Surface Labs
COMMONWEALTH FUNDING FOR CAPITAL PROJECTS RECOMMENDED $100 MILLION, FIVE-YEAR CAPITAL RELEASE PLAN
Community Education Center Facility — Design and Construction
Compact Shelving for Paley Library ground floor
Comprehensive Cancer Center — Ceiling Replacement OFM PDF Project Plan 06-27
Comprehensive Cancer Center - Domestic Water Heater Replacement OFM PDF Project Plan 07-22
Comprehensive Cancer Center — Fire Alarm System Upgrade OFM PDF Project Plan 06-52
Comprehensive Cancer Center -- Roof Replacement OFM PDF Project Plan 05-42
Comprehensive Cancer Center — Structural Repairs OFM PDF Project Plan 05-44
Comprehensive Rate Information System (CRIS) Software
Computer Classroom Conversion for Presser Hall 104 Smart Cart Ready Classroom Conversion for Presser Hall 327
Computer Life Cycle Replacement Program
Computer Terminal Replacement-Central Billing Office
Connect chilled water (Engineering & Architecture) 2004 Forecast 04-25
Construction for Phase I (of V) renovations of Beury Hall 2004 Forecast 04-20
Construction of Computer Training room in TECH Center Room 109.
Construction of Student Development Center
CONTINUO POSITIVE ORGAN
Conversion of CEA Room 528 to an environmental biotechnology lab
Conversions to Level 3 Smart Classrooms - Fiscal Year 2006-07
Conversions to Level 3 Smart Classrooms Fiscal 2004-05
Conversions to Level 3 Smart Classrooms Fiscal 2005-06
Conwell / Carnell Piping Replacement
Conwell Dance Studio HVAC - PDF Forecast # 63-03
Conwell Hall — Balcony Decking and Railing Replacement 2005 Forecast 05-45
Cosmetic Renovations to Kresge Mezzanine Student Lounge
Creation of Smart Classrooms in CAHP utilizing unexpended CAHP funds from the FY03 budget in combination with Univ. Computer Tech Funds approved in March 2003.
Curtain and Rod Replacement Johnson Hall Project 05-8 and Curtain and Rod Replacement Hardwick Hall 06-5
DARwin Implementation - Degree Audit Reporting System
Demolition of 2334 Park Avenue
Demolition of 3-story structure for construction of new medical school
Demolition of Cooney Apartments and Parking Lot
Demolition of Sjostrom Building Block
Dent Sim Computerized Dental Workstations
Dental Roof Retrofit, 2003 Forecast #40
Dental School — Interior Building and Clinical Improvements, Phase I (of 1V) OFM PDF Project Plan 07-18
Dental School — to reupholster and refurbish worn Dental Chairs and Operators Stools.
Dental School 1— Fire Alarm Replacement 2005 Forecast 05-46
Dental School Clinical Repairs
Department Vehicle / Recreation Services
Design & Construction of an addition to the Fox School of Business & Management (Alter Hall)
Design & Construction of an addition to the Fox School of Business & Management (Alter Hall)
Design and Construction of new laboratories (Beury —Rooms 311,316,318) for new faculty member in Chemistry - Dr. Nicholson.
Design and Construction of new laser laboratories (Beury —Rooms 101, 127) for new faculty member in Chemistry - Dr. Levis.
Design and Construction Services for the Fox School of Business Expansion
Design and Construction Services for Tyler School of Art Relocation
Design services for complete renovation of Beury Hall 2004 Forecast 04-2 1
Design Services for Renovations to Orthodontics Clinic
Diamond Club Renovations
Diamond Street Lighting Upgrade
Distilled water system replacement (Bio-Life) 2004 Forecast 04-22
Dr. Emily Keshner — Laboratory Equipment
DRIFT - A Negative Ion TPC for Dark Matter Search
Edberg-Olsen Hall Football Practice Field Extension
Electrical Upgrade of Johnson/Hardwick Halls (2005 Housing R&R Fund Project No. 05-10 and 2006 Housing R&R Fund Project Nos. 06-1, 2, 3 and 6)
Electromyography (EMG) Machine
Electronic Research Administration at Temple University (eRA@TU)
Elevator Upgrades Phase I 2003 Forecast #03-56
Elevator Upgrades Phase II 2004 Forecast 04-48
Elevator Upgrades Phase III
Elevator Upgrades, Phase IV of V — (Various) OFM PDF Project Plan 2005_06
Elevator Upgrades, Phase V (of V) — (Various) OFM PDF Project Plan 06-19
Engineering and Architecture Building Roof Retrofit, 2003 Forecast #36
Engineers Fees For Ambler Loop Road Parking Additions
Enhancement and Refurbishment of the Tuttleman Computer Lab
Environmental Engineering Research Lab — Room 505
Environmental Remediation (Various) 2004 Forecast 04-52
EQUIPMENT - Spectural Confocal Microscope with AOTf and heated stage
Equipment for Additional Biology 204 Labs
Expansion and Renovation of Temple University Harrisburg campus— furniture fixtures and equipment
Expansion of Back-up Capabilities
Expansion of Multimedia Urban Reporting Lab at Temple University Center City
Exterior Bench Replacement for 1300 CB Moore Residence Hall 2005 Project 05-25
Exterior Door Repairs/Replacement
Exterior Lighting for 1300 CB Moore Residence Hall
Exterior Repairs 2020 N. Broad Street Additional Funding
Facade Reconditioning Podiatric Medicine Campus
Facade Reconditioning Podiatric Medicine Campus
Faculty Student Union — Air Handling Units (AHU) Replacement OFM PDF Project Plan 06-53
Faculty Student Union — Curtain Wall Window Replacement 2005 Forecast 05-48
Faculty Student union — Steam Components Replacement OFM PDF Project Plan 05-50
Faculty Student Union Building Calking, 2003 Forecast #41
Faculty Student Union Electric Breaker Panels, 2003 Forecast #42
Faculty Student Union Exterior Doors, 2003 Forecast #43
Faculty Student Unon - Fire Alarm Replacement (HSC) OFM PDF Project Plan 06-29
Fence Replacement Parking Lot #1
Fire Safety Project Support
Fire Tower Door Replacement
First Floor Improvements-Klein Hall
Foot and Ankle Institute Lease
Foot and Ankle Institute Renovations
Football Practice Field Astroturf Replacement
Football Practice Field Logo
Football Practice Field Project
Football Video Editing System
Fox Laptop Learning Program
Fox School of Business & Management - Concept Plan
Fox School Of Business & Management Expansion — Schematic Design Services
Fox School of Business & Management Programming/Planning
Fresenius Outpatient Dialysis Center Repairs Kresge West Building — Floor 2
FSBM Renovations to Accommodate eBusiness and MIS
Ft. Washington Satellite Lease — Temple Orthopedics & Sports Medicine
Ft. Washington Satellite Lease Renewal
Furniture for the Dean’s Office
Game Room in the Bell Building
Geasy Field - Replace Track OFM PDF Project Plan 06-30
Geasy Field Lighting
Geology Department — Renovation of New Faculty Lab
Gladfeiter Ball, Room 215 — Renovating Lab Space
Gladfelter 914 Renovations to Russell Weigley Scholarly Library
Gladfelter Hall — Heating System Pump Replacements 2005 Forecast 05-51
Gladfelter Hall Roof Replacement 2004 Forecast 04-26
Gladfelter Mezzanine Repairs
Graduate School — Reconfigure and Renovate 501 Carnell Hall
Hardwick Hall Heat Exchanger Coil Replacement Project 06-4, Heating Valve Replacement Project 06-7 & Heating System Pump Replacement Project 06-8
Hardwick Residence Hall Drain Replacement
Harrisburg Lease Amendment
Health Science Center Steam Plant - Fire Alarm System Upgrade OFM PDF Project Plan 07-78
Health Sciences Center Central Steam Plant Boiler Burner Improvements PDF Reserve Fund 2006-07
Health Sciences Center Library Biomedical Information Center
Hiring of a Construction Management (CM) firm for pre-construction services of the 1800 Block of Liacouras Walk
Historical Dental Museum
HSC -- Repair/to underground high voltage 13,200-volt electrical cables
HSC — Repairs to underground high voltage 13,200-volt electrical cables
HSC Chilled Water System — Fill Replacement on BAC Cooling Tower OFM PDF Project Plan 07-77
HSC Steam Sy m — Steam Plant Repairs Park Street Steam and Condensate Piping Replacement OFM PDF Project Plan 07-79
HSC Steam System - Steam Plant Repairs - Deaerator Replacement OFM PDF Project Plan 06-46
IBM Mainframe Computer Replacement
ID Card Printer Systems Upgrade
Improvements Liacouras Center
Improvements to Lecture Hall 114 Speakman Hall
Improvements to TV Studio 1, TV Studio 2, and TV Studio 3
Installation of compact shelving
INSTALLATION OF COMPUTER LABORATORY IN JOHNSON/HARDWICK
Installation of Down-Draft Tables for Biology Teaching Labratories
Installation of Fire Alarm and Sprinkler at Podiatry Housing
Installation of Johnson/Hardwick Computer Laboratory Furnishings and Equipment.
Installation of Key Control System 2004 Project 04-10
Installation of NMR
Installation of Residence Watch Visitor Monitoring System 2004 Project 04-11
INSTALLATION OF SPRINKLER SYSTEM
Institute for Public Policy & Urban Studies
Institute for Public Policy arid Urban Studies
Insurance Verification Initiative
IronPort Spam Filter
J&H Student Housing — Major Renovations/ Upgrades (Bathroom/Electrical Wiring Upgrades, Sprinkler System Installation, Electrical Panel/Room Light/Capacitor Replacement, Emergency Generator Upgrade)
James S. White Residence Hall Renovation
Jeanes Physicians Office Building Suite 201 Sublease from Jeanes Hospital, Inc.
Johnson & Hardwick Student Housing Fire Protection and Plumbing Design Services 2004-05 Forecast 05-01, 05-02, 05-03, 05-04
Johnson Hall Interior Renovation
Johnson Hall, Interior Improvements and Renewal FY2007 Housing R&R Plan, Project Nos. 07-4, 07-5, 07-6, 07-7 & 07-8
Kardon Building — Paley Library Book Archive Storage
Klein Hall — Locker Replacement and Locker Room Renovations (Lower Level) OFM PDF Project Plan 07-53
Klein Hall -- Rebuild Air Handlers (10) 2004 Forecast 04-27
Klein Hall — Restroom Exhaust System/Ventilation Improvements OFM PDF Project Plan 07-52
Klein Hall Administrative Office Upgrades Floors 3, 6, 7 and 8
Klein Hall Classroom & Public Area Improvements — Design Services
Klein Hall Library — Phase I Renovations
Klein Hall Library Phase II Renovations
Klein Hall Library Renovations — Design Services
Klein Hall, Phase I -- North and South (Floors 7-9) Window Replacement OFM PDF Project Plan 06-31
Klein Hall, Phase II (of III) - Window Replacement OFM PDF Pioject Plan 07-19
Klein Refurbishment of Lecture Halls 1D and 1E
Kresge Hall — Air Handling Unit Replacement, Phase I 2005 Forecast 05-55
Kresge Roof Retrofit, 2003 Forecast #44
Lab and Practice Room Pianos-Boyer
Laboratory Construction Project Phase 2: Kresge Hall - Floor 6
Laboratory Construction Project Phase I: Design Assistance Kresge Hall - Floor 6
Laboratory Renovation - Center for Substance Abuse Research (CSAR)
Laboratory Renovation 5 Medical Research Building
Laboratory Renovation- 705 Medical Research Building (MRB)
Laboratory Renovation 7th Floor Medical Research Building
Laboratory Renovation Allocation-College of Science and Technology
Laboratory Renovation Medical Research Building — Floor 4
Laboratory renovations for the Center for Neurovirology and Cancer Biology
Landscape Arboretum at Temple University Ambler — Garden Improvements
Landscape Architecture Design Services for Ambler Formal Gardens
Landscape Master Plan for Temple University Main Campus
Lease Amendment for 1415 N. Broad Street, Suite 227
Lease at 259 N.3”t Street, Philadelphia, PA
Lease of 1415 N. Broad Street, 2nd Floor — 4,799 square feet for CSPCD’s grant-funded program
Lease of Space in Kresge West Building to Temple/Fresenius Joint Venture
Lease of Space in Kresge West Building to Temple/Fresenius Joint Venture
Lease with Mosaic Pizza dba Papa John’s Pizza
Lease with Rita’s Water Ice
Lease with Subway Real Estate Corp.
Lease with Yafi, Inc. doing business as Hummus at 1503 Cecil B. Moore Avenue
Lease/Sublease of Kardon/Atlantic Terminal Buildings
Lecture Hall Upgrades, 2003 Forecast #03 - 58
Level II Smart Classroom in Speakman 213
Level Ill Smart rooms in Barton 103,107, and 108
Liacouras Center Enhancements
Liacouras Walk South Redevelopment
Liacouras Walk South Redevelopment — Design & Construction
Library & Computing Center (Ambler) — HVAC Unit Replacement 2005 Forecast 05-58
Library and Academic Renovations — Summer 2003
Library Server
List and Sale of .5 acres of vacant property in Cecil County, Maryland
Main Campus - Fire Tower Door Replacements, 2003 Forecast #47
Main Campus Central Steam Plant Rehabilitation
Main Campus Smart Classroom Upgrades
Main Campus Steam Plant Backup Boiler
Main Campus Steam Plant Expansion Engineering
Main Campus Steam Plant Rehabilitation - Phase 3
Main Campus Steam Plant Rehabilitation — Phase II
Main roof replacement at Johnson Hall. 2004 Project 04-2
Mainframe Computer Data Storage System Replacement
Maintenance and Repairs (Main Steam Plant) 2004 Forecast 04-41
Major Renovations to Ambler East Hall 2004 Project 04-8
McGonigle Hall Entry Slate, 2003 Forecast #48
McGonigle Hall Replace Pool Grout 2004 Forecast 04-30
Medical Research - Building Motor Control Center Upgrade, 2003 Forecast #20
Medical Research - Rehab Breakers, 2003 Forecast #21
Medical Research Building - Exhaust Fan Replacement OFM PDF Project Plan 06-55
Medical Research Building — Handicap Ramp & 1st Floor Window Curtain Wall OFM PDF Project Plan 07-25
Medical Research Building - Pneumatic Controls Replacement OFM PDF Project Plan 07-26
Medical Research Building - Reheat Coil Replacement OFM PDF Project Plan 07-27
Medical Research Building - Roof Replacement OFM PDF Project Plan 06-56
Medical Research Building (MRB) Lobby Renovation
Medical Research Building Air Handler Replacement, 2003 Forecast #22
Medical Research Building Exterior Doors, 2003 Forecast #23
Medical Research Building Limestone Repairs
Medical School Design Feasibility.
Medical School Feasibility Study — Phase 2
Microbiology and Immunology/NIH Construction Grant — Phase II
Migration and Upgrade of Blackboard® Course Management Delivery and Community Portal System.
Miscellaneous Security Upgrades 00
Mitten Hall & Annex — Ball Room Ceiling Wood Strip Restoration/Replacement 2005 Forecast 05-60
Mitten Hall & Annex — Ball Room Ceiling Wood Strip Restoration/Replacement 2005 Forecast 05-60
Mitten Hall & Annex — Fire Alarm Replacement 2005 Forecast 05-6 1
Mitten Hall & Annex — Restroom Accessibility Upgrades 2005 Forecast 05-62
Mitten Hall Conference Room
Mitten Hall Great Court Air Conditioning & New Sound System/Acoustical Treatment 2005 Forecast 05-59
Modernization of Elementary Science Lab Classroom
Modernization of Secondary Science Lab Classroom
Move Temple University functions from Sjostrum Building.
Moving the Institute on Disabilities and renovations to the 6th floor of the University Services Building
Music School Dean’s Offices Improvements
Nanotechnology Institute Research & Development Program
Network Attached Storage
New Cooney Residence
New Cooney Residence Professional Services
New Dental School Replace Entire VAV Control System
New E-Mail system
New Faculty Start-Up Equipment
New Faculty Start-Up Equipment
New HSC Parking Garage
New HSC Parking Garage Modular Office
New Medical School
New Medical School — Design and Pre-Construction Management Services
New Stereo Cabinets
North Campus Parking Lot
North Campus Parking Lot — Design Services OFM PDF Project Plan 06-54
Obesity Research Center 1st Floor Old Dental School Building
Obstetrics and Gynecology Clinical Renovation 7 Outpatient Building
Office of Budget & Management Design and Renovation
Office of Multicultural Affairs Design and Renovation
Office of Partnership Schools, Renovation and Relocation
Old Medical School — Roof Repairs 2005 Forecast 05-65
Old Medical School Fire Tower Doors, 2003 Forecast #25
Old Medical School MCC Refurbishment
Old Medical School Rehab Air Handler, 2003 Forecast #24
Ophthalmology Renovations Phase 1: Design Assistance First Floor Cancer Center Building
Opioid & Chemokine Receptors Interactions Relative to HIV
Optimal Detection of Chemical & Biological Agents
Orthopedic Mt. Laurel, New Jersey Lease
Outfitting of Office of Planning and Policy Analysis
PA Dept of Education Engineering Equipment Grant
Paint and re-carpet Johnson & Hardwick Residence Halls
Paley - Primary Breaker Rehab, 2003 Forecast #49
Paley Library — Correct Leaking in Basement Roof OFM PDF Project Plan 06-35
Paley Library Pre-Design Study
Parkinson Pavilion TUP Practice Suite Upgrades
Passenger elevators upgrade at Johnson/Hardwick Halls and Podiatric Student Residence Complex 2004 Project 04-1
PC/Printer Purchase
PEABODY WATER TRAPS, GALVANIZED WASTE LINES AND SHUT—OFF VALVES
Pearson / McGonigle Air Handlers
Pearson Hall — BioKinetics Lab Renovations
Pearson Hall — Kinesiology Lab/HF WC/Gymnasium Renovations
Pearson/McGonigle Halls - Hot Water Heating Loop Replacement OFM PDF Project Plan 06-36
Pearson/McGonigle Halls — Pool Heat Exchanger Replacement OFM PDF Project Plan 07-54
Perimeter CCTV Surveillance System Replacement
Pharmacy - Chiller, 2003 Forecast #26
Pharmacy Building — Air Handling Unit (AHU) Upgrades OFM PDF Project Plan 06-37 Pharmacy Building — Penthouse AHU Replacement OFM PDF Project Plan 06-3 9
Pharmacy Building — Basement Air Handling Units (AHU) Replacement OFM PDF Project Plan 06-57
Pharmacy Building — Fume Hood Exhaust Fan Replacement OFM PDF Project Plan 06-38
Pharmacy Building -- Penthouse AHU replacement OFM PDF Project Plan 06-39. MARKED AS "CANCELLED".
Pharmacy Building — Starter/Disconnect Replacement OFM PDF Project Plan 05-70
Phase 5 of the Smart Classroom Plan
Phase II (of UI) Renovations to Lecture Halls (Various) 2004 Forecast 04-45
Phase II air handler replacement (Medical Research) 2004 Forecast 04-33
Phase III (of III) Building Assessments 2004 Forecast 04-51
Phase VI of Apartments Renovations at the Podiatric Student Residence Complex — FY2007 Housing R&R Plan Project 07-2
Physics Conference Room
Physics Department Renovation of Faculty Lab
Physiological Psychology Lab / Marshall
Plan to Renew Temple’s Mission--Advanced Technology Plan, Part II: Univ. Telephone System Upgrade & Telecommunication Infrastructure Improvements.
Planetary Scanner
Podiatric Medicine Building - Data Rack Relocation OFM PDF Project Plan 07-74
Podiatric Medicine Building — Domestic Water Heater Replacement OFM PDF Project Plan 05-71
Podiatric Medicine Building — Roof Replacement OFM PDF Project Plan 05-72
Podiatric Medicine Building - Structural Repairs OFMPDF Project Plan O5.74
Podiatric Medicniêilding - Air Handling Unit Replacement OFM PDF Project Plan 07-75
Podiatry Housing Complex Data, Telephone and Cable Installation-Phase I
Podiatry Housing Complex Renovation
Podiatry Housing Complex Renovation of 12 Apartments and 2 Corridors
Police Vehicles
Pre Clinical Lab Repair
Presser Hail — Practice Room Acoustic Treatment Replacement OFM PDF Project Plan 07-66
Presser Hail & Annex - Fire Alarm System Upgrade OFM PDF Project Plan 06-41
Presser Hall — Acoustic Ceiling Replacement, Large Classrooms OFM PDF Project Plan 07-55
Presser Hall — Handicap Access to Basement Classrooms/Toilets OFM PDF Project Plan 07-62
Presser Hall — Heating Ventilation and Air Condition (HVAC) Control System Upgrade OFM PDF Project Plan 07-63
Presser Hall — Motor Control Center Replacement OFM PDF Project Plan 07-64
Presser Hall - Practice Room/Classroom Door OFM PDF Project Plan 07-65
Presser Hall & Annex — Air Handling Unit Replacement QFM PDF Project Plan 07-5 7
Presser Hall & Annex — Fire Alarm and Sprinkler System Installation OFM PDF Project Plan 07-61
Presser Hall Addition — Design Services
Presser Hall Klein Recital Room Renovations
Presser Roof Replacement
Pressure Seal Folder/Sealer
Programming and Design of the—Student Center Phase II Project Description
Project Planning/Design/Review Services
Psychology Department Renovations — Weiss Hall Basement, B-18 & B19
Purchase and Installation of Down-Draft Tables for Biology Teaching Laboratories.
Purchase and Installation of Ultrafast Laser System
Purchase of "Harvey” Patient Simulator for Simulation Center
Purchase of a 320 KV Irradiation System
Purchase of a Confocal Microscope
Purchase of an API 4000 LCIM5IMS
Purchase of an Olympus IX 81 microscope with a high qualify fluorescence imaging system to study the role of calcium and cell signaling in heart cells.
Purchase of Apple computers with Link-to-Learn grant funds
Purchase of Equipment and Furnishings for new Proteomics Core Research Facility.
Purchase of equipment for Biokinetics Research Laboratory
Purchase of Equipment Related to Biochemistry/NIH Grant Orotate Phosphoribosyltransferase-mechanism
Purchase of Functional MRI Goggles
Purchase of Multifunctional Imaging Equipment for Proteomics Core Research Facility.
Purchase of Muscle Performance Analyzer
Purchase of Nikon Tc-2000U inverted microscope and Metafluor Imaging System.
Purchase of Overbooking Furniture
Purchase of Overbooking Furniture-Additional Funding
Purchase of pediatric echocardiography system and reading station.
Purchase of Precision BI computer software and technical support by Global Works Systems, Inc. to develop the system interface.
Purchase of Safes for 1300 (Additional Funds)
Purchase of the Smiths Detection Portable Gas & Vapor ID System
Purchase of the Smiths Detection Portable HazMat ID System
Purchase of two police vehicles
Purchase of Zeiss Light Microscopy Equipment
Purchase olelectronic patient diary system.
Purchasing an IVIS5O optical imaging system for research
Radio System Upgrade
Reactivity Epitopes for Ribonucleus III Substrates
Rebuild Cooling Towers (Pharmacy Building) 2004 Forecast 04-36
Rebuild eight air handlers (Anderson Hall) 2004 Forecast 04-16
RECONFIGURATION OF PEABODY SECURITY DESK
Reconfigure/Upgrade Ritter Annex 2nd Floor Space
Rehab Restrooms (Paley Library) 2004 Forecast 04-3 5
Relocation / Expansion CRHDE
Relocation and Expansion of Philadelphia Federal Credit Union on the Lower Level of the Student Center
Relocation of Grounds Department
Relocation of ROTC to the lower level of Ritter Hall
Relocation of the offices of Chief Financial Officer & Treasurer, Provost and the Executive Vice President to the lower level of Sullivan Hall
Relocation of Tuttleman Counseling Center
Relocations for Institutional Advancement, Alumni Affairs, Special Events and the Blockson Collection
Renovate Bursar’s Office (115 Carnell Hall)
Renovate Space in Bright Hall to Accommodate a Hoagie shop
Renovation - Fourth Floor Kresge Hall
Renovation - Old Medical School - 306, 307, 308 and Entrance Corridor.
Renovation 0f4th Floor Apartments at Podiatric Student Residence Complex. 2004 Project 04-6
Renovation for Game Room in Bell Building — Additional Funding
Renovation of 5th Floor Apartments at Podiatric Student Residence Complex 2005 Project 05-20.
Renovation of BSL-2 Laboratory Space & Construction of BSL-3 Facility on the 4th Floor of BioLife Building
Renovation of Dr. Lim's laboratory — Bio—Life Bldg, Rm. 435
Renovation of First and Second Floors of Comprehensive Cancer Center for Temple University Physicians Outpatient Facility
Renovation of Gas Labs
Renovation of Lab #515(A) Pharmacy Allied Health Building
Renovation of Laboratory Space in Beury Hall for new Chemistry faculty member Dr. Jan Feng
Renovation of Laboratory Space in Biology Life Sciences Building for Dr. Antonio Giordano
Renovation of Laboratory Space in Biology Life Sciences Building for Dr. George Tuszynski
Renovation of Laboratory Space in the Medical Research Building and the Old Medical School for the Department of Microbiology and Immunology
Renovation of lecture hall 101
Renovation of Louis J. Esposito Dining Court Ceiling & Lighting System
Renovation of lst Floor Sullivan Hall
Renovation of Nursing Resource Center (Nursing Lab)
Renovation of Office of Vice President for Research & Graduate Studies, 4th Floor, University Services Building
Renovation of Podiatric Student Residence Complex Apartments 303 & 307 for handicapped accessibility 2004 Project 04-7
Renovation of Room 110
Renovation of Sixth Floor Apartments 2006 Project 06-9 and Replacement of First Floor Wall Covering Project 06-10 at the Podiatric Student Residence Complex
Renovation of space in the Bell Building for WHIP Student Radio Station.
Renovation of Suite 615
Renovation of Tableting Facility
Renovation of the first floor of Weiss Hall, Phase I of a two-part project to create the Interdisciplinary Center for Community Based Health Initiative.
Renovation of the Supervisors Office Main Campus, Floor, Bell Building
Renovation of third floor interior space into Dean’s Office suite
Renovation of Vice President for Student Affairs Suite 402 Conwell Hall
Renovation of Vivacqua Bookstore
Renovation/Upgrade of computer labs
Renovations - 7th Fl. Conwell
Renovations and move of PR-HSC office to 3421 Carlisle St., 2nd Floor
Renovations of 411-414 Vivacqua Hall
Renovations of 425 Commerce Drive
Renovations of Base Building Systems at the Podiatric Student Residence Complex (2005 Housing R&R Fund Project Nos. 05-2 1, 22, 23, 24 and contingency)
Renovations to 4th Floor of Bell Building for Planning and Policy Analysis (Required to move Measurement & Research Center from Sullivan Hall)
Renovations to 4th Floor of Conwell Hall
Renovations to Klein Hall, 2ni, 4th, 5th, 6th, & 8th Floors
Renovations to Rooms 304 and 306 in Vivacqua Ball
Renovations to Rooms 422(A) and 423 In PAHB.
Renovations to Study Areas and Seminar Rooms (Klein Hall)
Renovations to Suite 211, Vivacqua Hall
Renovations to Suite 610 & 613 USB
Renovations to Temple University School of Dentistry’s Center for Clinical & Translational Research.
Renovations to TUSPM Surgical Suite
Renovations, Rooms 301 and 302 USB
Renovations, Rooms 301, 302 and 309 USB
Renovations, Rooms 601 and 602 USB
Repair Air Handler Units (Vivacqua Hall) 2004 Forecast 04-53
Repair and paint mechanical equipment (Anderson Hall) 2004 Forecast 04-18
Repair/replace alcove and stage floor (Mitten Hall) 2004 Forecast 04-34
Replace domestic water system (Presser Hall) 2004 Forecast 04-37
Replace Gymnasium Floor in Student Faculty Center
Replace Hardwick Hall Kitchen Roof
Replace Hot Water System (Sullivan Hall) 2004 Forecast 04-44
Replace Johnson Hall Social Lounge Roof
Replace locker room shower mixing valve (McGonigle Hall) 2004 Forecast 04-31
Replace Roof (Wachman Hall) 2004 Forecast 04-54
Replace steam condensate line (Ritter Annex) 2004 Forecast 04-39
Replace sump pumps (McGonigle Hall) 2004 Forecast 04-32
Replace the Mural of Leon Sullivan
Replace two hot water converters (Anderson Hall) 2004 Forecast 04-17
Replacement of a Damaged Argon Ion laser system with a Verdi V10 solid state laser.
Replacement of air handler at Sullivan Hall
Replacement of Chiller — School of Podiatric Medicine
Replacement of Dental Operatory Units
REPLACEMENT OF LOWER ROOFS AT JOHNSON/HARDWICK
Replacement of Outdated Autoclaves
Replacement of Roof at Podiatry Residence Hall
Replacement of Temple Towers Roof
REPLACEMENT OF TEMPLE TOWERS ROOF
Research Affiliation and Lease Agreement with Shriners Hospital for Children and Increased Scope for New Medical School Facility
Research Equipment
Research project entitled: Acquisition of e-Server Linux cluster
Research project entitled: Acquisition of laser system for chemical and biological agent detection.
Research project entitled: Acquisition of one regenerative amplifier and two optical parametric amplifiers.
Residence Hall Security Camera System Upgrade (2006 Housing R&R Fund Project)
Resource 25 Implementation
Resurface Parking Area #3
Resurfacing of Erny Outdoor Court at the IBC Student Recreation Center
Ritter Annex Roof Replacement 2004 Forecast 04-38
Ritter Hall -- Restroom Upgrades OFM PDF Project Plan 06-42
Ritter Hall 106 Renovation
Ritter Hall 106 Renovation
Ritter Hall 301/303 Renovation
Ritter Hall Annex — 9th Floor
Ritter Hall Annex Basement
Ritter Hall Bridge Repair
Ritter Hall Calking, 2003 Forecast #52
Ritter Hall, Ritter Annex, and Wachman Hall - Lobby and General Spaces Upgrades OFM PDF Project Plan 06-43
Robotic Backup Tape Library for Disaster Recovery
Roof Coping Stone Repairs (White Hall) Project 07-10
Roof Retrofit (Dixon Hall, Ambler Campus) 2004 Forecast 04-24
Roof Retrofit (Kresge West) 2003 Forecast 03-44
Rydal ENT Satellite — Third Amendment to the Rydal Satellite Lease - Expansion
Rydal ENT Satellite Lease - Second Amendment To Lease
Rydal ENT Satellite Office Lease
S.A.C. Renovation/Expansion-Phase I Additional Funding (amended)
Sale of 4150 Henry Avenue
Sale of approximately 15.5 acres of land in Montgomery County, Maryland
Sale of approximately 15.5 acres of land in Montgomery County, Maryland
Sale of property at Egg Harbor Township, NJ.
Satellite Diabetic Wound Healing Center
Scanning Probe Microscopy
School of Dentistry - Orthodonics Clinic
School of Medicine New Facility — Programming. Planning and Conceptual Design
School of Social Administration Renovation of Classroom and Student Lounge Space
Search for Persistent Hole Burning Material
Security Cameras
Site License Agreement with Celico Partnership d/b/a Verizon Wireless
Site License Agreement with Celico Partnership dlb/a Verizon Wireless
Spatial Intelligence Learning Center -Third Floor Weiss Hall
Speakman Hall — Design of Renovations to Ensure Integration with the new Alter Hall OFM PDF Project Plan 07-67
Speakman Hall - Fire Alarm/Sprinkler System Upgrades
Speakman Hall — Structural Analysis & Correction Allowance OFM PDF Project Plan 05-79
Speakman, Anderson and Pearson Master Clocks
Steam Distribution System — Tunnel Work OFM PDF Project Plan 06-45
Steam Plant Capacity Expansion, Phase I and II OFM PDF Project Plan 06-18 and 07- XX
Stem Cell Research Lab Phase I
Storage Area Network
Store Improvements to Vivacqua Bookstore
Student Activities Center Renovation/Expansion - Phase 1 Design Services
Student Activities Center Renovation/Expansion-Phase I Construction
Student Center Phase II Renovation and Construction
Student Clinical Management System (SCMS)
Student Pavilion — Chiller Replacement
Sullivan Hall — First Floor Renovations (University Counsel)
Sullivan Hall — Restroom Upgrade and Remodel OFM PDF Project Plan 07-68
Sullivan Hall Roof Replacement
Support Unit Relocations — Bell Building
TCP/IP Based interface
Teaching, Education, Collaboration and Help (TECH) Center
Technology and facilities improvements to Annenberg Hall classrooms
Temple Towers Assessment Study
Temple Towers Carpet Replacement (2005 Housing R&R Fund Contingency Project)
Temple University Facilities Condition Re-Assessment
Temporary Relocation Space During Major Capital Construction
Temporary Steam Boiler (Main Steam Plant) 2004 Forecast 04-42
Temporary Steam Plant Boiler Rental Extension and Purchase
Testing Materials for Biomaterials Laboratory
The Apollo of Temple Entertainment Center and Parking Garage Construction
Ticket Office Renovations — Liacouras Center Purchase of Athletic Ticketing System
Tiffany & Co. Graduate Research Fellowship in Metals/Jewelry/CAD-CAM
Tomlinson and Randall Theaters Stage Lighting System Replacement
Tomlinson Theater — Lighting for Opera Productions OFM PDF Project Plan 07-69
Transfer of CST Advising Unit from Barton Hall to Floor 1810 Liacouras Walk
Transform Former Lab, Room 543 Pharmacy Building, into a Central Animal Facility (CAF) Animal Holding Area for the Fels Institute
Travel Agency Lease in Student Center
Triangle Apartments Roof Repair
TUCC - Relocation
TUCC 1515 Market St. Renovations-Design & Construction
TUSM Department of Ophthalmology — Broomall Satellite Lease Renewal
TUSM Department of Orthopedics - Marlton, NJ Satellite Lease Renewal
TUSM Technology Advancement Project
Tuttleman Learning Center Guardrail Installation — 4th Floor Lounge
Tuttleman Learning Center Room 5B Conversion
Tuttleman Projection Booth Fit out
Tuttleman Smart Classroom Conversion
Tyler School of Art — Relocation to Main Campus
University Services Building — New Control System & Reheat Installation OFM PDF Project Plan 06-47
University wide Network Firewall
Updated Office Suite Department of Internl Medicine
Upgrade MARC’s Optical Scanning System
Upgrade of Electrical Distribution System at East/West Residence Hails, Ambler Campus
Upgrade of existing NSE-111 atomic force microscope
Upgrade of obsolete Coherent Inc. Argon Ion Lasers (Innova 100-20) to newer models that can be maintained (Innova 400-20 and Sabre -20-DBW)
Upgrade of Residence Hall CATV Cabling to Accommodate Premium Channel Offerings
Upgrade Renovations to Unit 7A - 1820 Rittenhouse Square
Upgrades to Front Entrance of Peabody Hall (FY07 Contingency Project)
Upgrading CEA Classroom 309
Utility Engineering Standing Order
Vacated Departmental Library Spaces Renovations OFM PDF Project Plan 07-7 1
Various — Animal Facility - Preparations for Inspections OFM PDF Project Plan 0647
Various - Classroom Upgrades OFM PDF Project Plan 04-50 OFM PDF Project Plan 05-89
Various — Electrical Repairs 2005 Forecast 05-85
Various - Elevator pgrades OFM PDF Project Plan 07-70
Various — Lecture Hall Upgrades, Phase Ill (of III) 2005 Forecast 05-17
Vehicle Replacement
Vehicle Replacement OFM PDF Project Plan 07-09
Vehicle Replacement PDF Forecast #04-10
Vehicle replacement PDF forecast 04-10
Vicon System Upgrade
Video Teleconferencing Center Room 105 Medical Research Building (MRB)
Wachman Hall Data Center UPS Upgrade
Wachman Hall Data Center UPS Upgrade
Wachman Hall Elevator Control Modification
Wachman Hall Floors 1,8, 10 Install new Metal Halide Fixtures
Wachman Penthouse Motor Control Panel, 2003 Forecast #59
Wachman/Barrack Central Chilled Water Cooling Tower Expansion
Walkway Repair
Web Based Effort Reporting System
Weiss - Rebuild Air Handlers, 2003 Forecast #60
Weiss Hall — Emergency Generator Replacement OFM PDF Project Plan 07-72
Weiss Hall — Motor Control Center Replacement OFM PDF Project Plan 07-73
Weiss Hall — Spalled Concrete Repairs OFM PDF Project Plan 06-49
Weiss Hall Renovations
Weiss Hall Roof Retrofit, 2003 Forecast #62
Wendy’s Lease
Window and screen replacement at Peabody Hall. 2004 Project 04-4
Wireless Football Sideline Communication System (Headsets)
Wyncliffe House Stabilization
Zahn Library Conversion
Temple University - CER Document Search
Search by document title:
Search by CER Log ID:
Search for a particular submitter:
A. Marjatta Lyyra
Allen Nicholson
Andy Riccardi
Anita Cilea
Aquiles Iglisias
Arthur Papacostas
Benjamin Evans
Betsy Barber
Bill Bradshaw
Bill McMaster
Brian Schwartz
C. Kent McGuire
Carl Bittenbender
Carl Holmes
Carol Buck
Catherine Paster
Charles Jurigreis
Cheryl Vermey
Chris Platsoucas
Clarence Armbrister
Concetta Stewart
Daniel Boston
Daniel Strongin
David Adamany
David Brown
David Glezerman
David Goodman
David O'Brien
Deborah Hartnett
Eileen Aitken
Elissa Farina
Eric Borguet
Eric Roedl
Frank Annunziato
Frank Erdlen
George Baran
George Moore
George Palladino
Gerard Criner
Glenn Isaacson
Greg Wacker
Ira Schwartz
Irene Boyle
Ivy Bayard
James Degnan
James W. Hilty
Jay Falkenstein
Jill Derstine
Jim Cirillo
Jim Trusdell
Jimmy Collins
John Daly
John DeAngelo
John DeLio
John Francescone
John Mattiacci
John Trudeau
Joseph Leotti
Joyce Lindorff
Kamel Khalili
Ken Kaiser
Kenneth Soprano
Keya Sadeghipour
Kurt Bresser
Larry Icard
Lily Lodhi
Linda Frazer
Linda M. Mauro
Lisa Matz
Marc Getty
Mark Eyerly
Martin Dorph
Martin Tansy
Martyn Miller
Marvin Gerstein
Marylou Delizia
Maureen Pastine
Michael Duncan
Michael Messersmith
Michael Pliskin
Mohammad Kiani
Morris Vogel
Moshe Porat
Nae Dun
Nick Mansor
Patrick Piggot
Perry McFarland
Peter Jones
Peter Liacouras
R. Ivan Lugo
Rhonda Brown
Richard Brodhead
Richard Kozera
Richard Rumer
Robert Buchholz
Robert Kroh
Robert Levis
Robert Lux
Robert Reinstein
Robert Stanley
Robert Stroker
Robin Johnson
Rochelle Toner
Ronald Brown
Ronald Tuma
Rosemary Dillon
Sandy Kyrish
Sarah Grey
Shohreh Amini
Sophia Wisniewska
Spiridoula Matsika
Stanley Lechtzin
Stephen Aronoff
Steve Young
Steven Houser
Sue Alcedo
Susan Albertine
Theresa Powell
Thomas Dinardo
Thomas Freitag
Thomas Kupp
Thomas Rogers
Timothy O’Rourke
Tom Healey
Tom Wible
Trevor Sewell
Valadia Walker
Vanessa R. Rose
Vanessa Yingling
Vickie Sierchio
Walt Wolansky
Walter Weidenbacher
William Bergman
Zamier Hasan
Search by funding center:
Search for submitting department:
Ambler - Dean's Office
Athletics - Administration
Athletics - Football
Business Services
Campus Safety Services
Cardiovascular Research Center
Center for Social Policy and Community Development
CLA - Dean's Office
CLA - Information Technology Office
CLA - Psychology
College of Education - Dean's Office
College of Education - Institute on Disabilities
College of Education - Kinesiology
College of Engineering - Civil & Environmental
College of Engineering - Dean's Office
College of Engineering - Electrical
College of Engineering - Mechanical
College of Health Professions - Dean's Office
College of Health Professions - Nursing
College of Health Professions - Public Health
College of Music - Dean's Office
Communications
Computer & Information Services
Computer Services Telecommunications
Controllers Office
CRHDE
Environmental Health & Radiation Safety
Facilities Management
Financial Affairs
Fox School of Business - Dean's Office
Graduate Office
Human Resources
International Services/IELP
Joint Executive & Business/Finance Committee
Measurement & Research Center
Music - Administration
Music - Choral & Keyboard Departments
Office of Management and Budget
Office of Multicultural Affairs
Office of Planning and Policy Analysis
Office of Space Management
Office of the Bursar
OVP - Undergraduate Studies
Paley Library
Parking Services
Pharmacy - Dean's Office
Pharmacy - Pharmaceutical Sciences
Podiatric Medicine - Dean's Office
President's Office
Provost Office
Public Relations, Health Science Center
Research and Graduate Studies
Risk Management & Insurance
SCAT - Dean's Office
School of Dentistry - Clinical Affairs
School of Dentistry - Dean's Office
School of Dentistry - Dental Informatics
School of Dentistry - Orthodonics Clinic
School of Dentistry - Restorative Dentistry
School of Law - Dean's Office
School of Medicine - Anatomy & Cell Biology
School of Medicine - Biochemistry
School of Medicine - Cardiovascular Research Center
School of Medicine - Central Animal Facility
School of Medicine - Dean's Office
School of Medicine - Fels Institute
School of Medicine - Finance Office
School of Medicine - Lung Center
School of Medicine - Medical Practices
School of Medicine - Microbiology/Immunology
School of Medicine - Neurology
School of Medicine - Neurovirology & Cancer Biology
School of Medicine - Orthopedics/Sports Medicine
School of Medicine - Otolaryngology
School of Medicine - Pediatrics
School of Medicine - Pharmacology
School of Medicine - Physiology
School of Medicine - Radiology
School of Medicine - Temple Physicians Inc
School of Medicine - Temple University Physicians
School of Social Administration
School of Social Administration - Dean's Office
School of Tourism and Hospitality Management
Science & Technology - Biology
Science & Technology - Chemistry
Science & Technology - Computer Sciences
Science & Technology - Deans Office
Science & Technology - Geology
Science & Technology - Mathematics
Science & Technology - Physics
Science & Technology - Student Development Center
Senior Vice President's Office
Student Affairs
Student Affairs - Recreation Services
Temple University Fort Washington
Temple University Harrisburg
Temple University Health System
Temple University Physicians
Tyler School of Art - Architecture
Tyler School of Art - Crafts, Metals/Jewelry/CAD-CAM Area
Tyler School of Art - Dean's Office
University Counsel
University Housing
University Relations/Office of Publications
Vice President for Operations
Vice Provost for Research
Vice Provost for Undergraduate Studies
Search by project $ estimate:
Greater Than
Less Than
Equal To
Between